Skip to content
smart charging

Load Management

The load management/load balancing feature can be used to limit the power used by chargers to prevent overloading the circuits and tripping breakers. By limiting the power, it could also be useful if you want to avoid accidental high peak usage. To accomplish this, a charging point can be assigned to a circuit. A circuit can have a maximum current value (maxCurrent) and/or a maximum power value (maxPower). The system works hierarchically, i.e., an electrical circuit can be part of a higher-level electrical circuit.

The section circuits defines the circuits. Each charging point can then be assigned to an electrical circuit.

circuits:
- name: main # unique name, other circuits reference it via parent
title: "main circuit" # name for the UI (not implemented in UI yet)
maxCurrent: 63 # 63A (optional)
maxPower: 30000 # 30kW (optional)
meter: grid # optional
loadpoints:
- title: Garage
circuit: main
# ...
- title: Carport
circuit: main
# ...

This configuration defines the main circuit main with a maximum power of 30 kW and a maximum current of 63 A per phase. The charging points Garage and Carport are assigned to this circuit. If other consumers such as an oven or heat pump (this requires a meter) draw a total of 50 A, the charging points are only allowed to use the remaining 13 A. Since the grid meter is assigned to this circuit, the power of the charging points will be throttled so that the limits are not exceeded at the grid connection. Without the grid meter assigned, the limits apply directly to the sum of all charging points.

circuits:
- name: main
title: "main circuit"
maxCurrent: 48
- name: garage
title: Garage
maxCurrent: 32
parent: main
- name: carport
title: Carport
maxCurrent: 32
parent: main
loadpoints:
- title: Garage A
circuit: garage
- title: Garage B
circuit: garage
- title: Garage C
circuit: garage
- title: Carport A
circuit: carport
- title: Carport B
circuit: carport
- title: Heat Pump
circuit: main

Here we have two circuits, garage and carport, both of which are children/downstream of the main circuit (parent: main). The main circuit has a maximum current of 48 A. The circuits garage and carport each have a maximum current of 32 A. The charging points Garage A, Garage B, and Garage C are assigned to the garage circuit (circuit: garage). The charging points Carport A and Carport B are assigned to the carport circuit (circuit: carport). The circuits garage, carport, and the heat pump are connected directly to the root circuit (main). The regulation ensures that the limits of the respective circuits are not exceeded at any time.

Important: There must always be exactly one root circuit (a circuit without parent property).

By default, the control system calculates the current power and current from the sum of the respective charging points. By configuring a meter on a circuit, the real load can also be taken into account. This is particularly useful if other consumers are also connected to the fuse.

site:
meters:
ext:
- carport_meter
meters:
- name: carport_meter
type: template
template: shelly-3em
circuits:
- name: carport
meter: carport_meter
maxCurrent: 32

Note: If a meter is used that is not yet used for another purpose (e.g. grid), it must be linked as an external meter under site.meters.ext.

Both a maximum current per phase (maxCurrent) and a maximum power (maxPower) can be configured on each circuit. These values, if configured, are monitored independently of each other. A value of 0 means no limit, the same as leaving the setting out.

If necessary, external limits can also be defined using GetMaxCurrent and GetMaxPower. In the event of an error, the predefined limits apply. Here too, 0 means no limit and does not block the circuit. To stop all charging on a circuit, return a very small value such as 1 instead.

Example:

circuits:
- name: main
title: "main circuit"
maxCurrent: 48
GetMaxCurrent:
source: mqtt
topic: ext/maxcurrent
maxPower: 33000
GetMaxPower:
source: mqtt
topic: ext/maxpower

For chargers with automatic phase switching (1P/3P), load management can use the switching capability to charge within the configured limits. When available power is insufficient for 3-phase charging, evcc automatically switches to 1-phase charging.

This applies to fast charging and plan-based charging as well. For example, if load management limits available power to 3.5 kW, evcc switches to 1-phase charging (from 1.4 kW) instead of pausing the charge.

Requirement: The charger must support phase switching.

Some chargers come with their own load management features. It is strongly recommended to disable these or use chargers without built-in intelligence. evcc expects devices to follow its commands directly. Other configurations may cause unexpected behaviour and must be tested thoroughly on your own.

  • Current values and limits of individual circuits are displayed on the configuration page in the UI. Visualization at the charging point is planned.
  • priority settings at the charging point are not yet taken into account.
  • New sessions receive only the remaining circuit headroom. Rebalancing across active sessions is not yet supported.
  • Home battery grid charging is not considered. When the home battery actively charges from the grid, this consumption is not included in load management calculations. However, during active § 14a power reduction signals, grid charging is automatically paused.