Skip to content
EN | DE

cFos Power Brain Solar

This page shows the nightly version. Switch to the release version.

S0 meters must be configured separately as charge meter. Phase switching is only available with the Solar variant and must be enabled by the user:

  1. Home -> disable Load Balancing (Monitoring Mode)
  2. Configuration -> Hardware - Phase switch / Relais 2 (enable phase switching)

Supported features

  • mA regulation: Finer charging current regulation (mA instead of A) for better solar surplus use.
  • RFID: Integrated RFID card reader for vehicle identification.
  • 1P/3P: Automatic phase switching. Useful for solar surplus charging.
  • Dimmable: Power consumption can be reduced (e.g. §14a EnWG). See External Control.

Parameters

NameDescriptionValueLevel
hostIP address or hostname
Example: 192.0.2.2
optional
Configuration example for evcc.yaml

If you don't want to configure via the UI, you can alternatively use this YAML block.

chargers:
- name: my_charger
type: template
template: cfos
host: 192.0.2.2 # IP address or hostname