Salta ai contenuti
ricarica intelligente

enecess ecoMain

Grid metering uses the ecoMain main circuit; PV, charging, and auxiliary metering can use branch channels on the ecoMain or an ecoSub.

Requires ecoMain firmware 139 or later.

Ambiti di utilizzo

  • Contatore di rete
  • Produzione solare
  • Contatore del caricabatterie
  • Consumatore intelligente

Parametri

NomeDescrizioneValoreLivello
idID Modbus
Predefinito: 1
intobbligatorio
hostIndirizzo IP o hostname
Esempio: 192.0.2.2
obbligatorio
portPorta
Predefinito: 502
intobbligatorio
phasecountNumber of phases

For single-phase metering, configure phase 1 only. For three-phase metering, also configure phases 2 and 3.

Predefinito: 1
facoltativo
device1Device (phase 1)

Selects the device to which the CT for phase 1 is connected. 0 = ecoMain, 1–3 = ecoSub.

Predefinito: 0
facoltativo
channel1Meter channel (phase 1)

Selects the meter channel to which the CT for phase 1 is connected.

Predefinito: 1
facoltativo
invert1Invert direction (phase 1)

Enable if the power for phase 1 is measured with the opposite sign.

Predefinito: false
facoltativo
device2Device (phase 2)

Only required for three-phase measurement. Selects the device to which the CT for phase 2 is connected. 0 = ecoMain, 1–3 = ecoSub.

Esempio: 0
facoltativo
channel2Meter channel (phase 2)

Only required for three-phase measurement. Selects the meter channel to which the CT for phase 2 is connected.

Esempio: 2
facoltativo
invert2Invert direction (phase 2)

Enable if the power for phase 2 is measured with the opposite sign.

Predefinito: false
facoltativo
device3Device (phase 3)

Only required for three-phase measurement. Selects the device to which the CT for phase 3 is connected. 0 = ecoMain, 1–3 = ecoSub.

Esempio: 0
facoltativo
channel3Meter channel (phase 3)

Only required for three-phase measurement. Selects the meter channel to which the CT for phase 3 is connected.

Esempio: 3
facoltativo
invert3Invert direction (phase 3)

Enable if the power for phase 3 is measured with the opposite sign.

Predefinito: false
facoltativo
Esempio di configurazione per evcc.yaml

Se preferisci non configurare il dispositivo dall’interfaccia, puoi usare questo blocco YAML.

meters:
- name: my_grid
type: template
template: enecess-ecomain
usage: grid
# Modbus TCP
modbus: tcpip
id: 255
host: # Hostname
port: 502 # Port
meters:
- name: my_pv
type: template
template: enecess-ecomain
usage: pv
# Modbus TCP
modbus: tcpip
id: 255
host: # Hostname
port: 502 # Port
phasecount: 1 # Number of phases, For single-phase metering, configure phase 1 only. For three-phase metering, also configure phases 2 and 3. [1, 3]
device1: 0 # Device (phase 1), Selects the device to which the CT for phase 1 is connected. 0 = ecoMain, 1–3 = ecoSub. [0, 1, 2, 3]
channel1: 1 # Meter channel (phase 1), Selects the meter channel to which the CT for phase 1 is connected. [1, 2, 3, 4, 5, 6, 7, 8, 9, 10]
invert1: false # Invert direction (phase 1), Enable if the power for phase 1 is measured with the opposite sign. (optional)
device2: 0 # Device (phase 2), Only required for three-phase measurement. Selects the device to which the CT for phase 2 is connected. 0 = ecoMain, 1–3 = ecoSub. [0, 1, 2, 3] (optional)
channel2: 2 # Meter channel (phase 2), Only required for three-phase measurement. Selects the meter channel to which the CT for phase 2 is connected. [1, 2, 3, 4, 5, 6, 7, 8, 9, 10] (optional)
invert2: false # Invert direction (phase 2), Enable if the power for phase 2 is measured with the opposite sign. (optional)
device3: 0 # Device (phase 3), Only required for three-phase measurement. Selects the device to which the CT for phase 3 is connected. 0 = ecoMain, 1–3 = ecoSub. [0, 1, 2, 3] (optional)
channel3: 3 # Meter channel (phase 3), Only required for three-phase measurement. Selects the meter channel to which the CT for phase 3 is connected. [1, 2, 3, 4, 5, 6, 7, 8, 9, 10] (optional)
invert3: false # Invert direction (phase 3), Enable if the power for phase 3 is measured with the opposite sign. (optional)
meters:
- name: my_charger
type: template
template: enecess-ecomain
usage: charge
# Modbus TCP
modbus: tcpip
id: 255
host: # Hostname
port: 502 # Port
phasecount: 1 # Number of phases, For single-phase metering, configure phase 1 only. For three-phase metering, also configure phases 2 and 3. [1, 3]
device1: 0 # Device (phase 1), Selects the device to which the CT for phase 1 is connected. 0 = ecoMain, 1–3 = ecoSub. [0, 1, 2, 3]
channel1: 1 # Meter channel (phase 1), Selects the meter channel to which the CT for phase 1 is connected. [1, 2, 3, 4, 5, 6, 7, 8, 9, 10]
invert1: false # Invert direction (phase 1), Enable if the power for phase 1 is measured with the opposite sign. (optional)
device2: 0 # Device (phase 2), Only required for three-phase measurement. Selects the device to which the CT for phase 2 is connected. 0 = ecoMain, 1–3 = ecoSub. [0, 1, 2, 3] (optional)
channel2: 2 # Meter channel (phase 2), Only required for three-phase measurement. Selects the meter channel to which the CT for phase 2 is connected. [1, 2, 3, 4, 5, 6, 7, 8, 9, 10] (optional)
invert2: false # Invert direction (phase 2), Enable if the power for phase 2 is measured with the opposite sign. (optional)
device3: 0 # Device (phase 3), Only required for three-phase measurement. Selects the device to which the CT for phase 3 is connected. 0 = ecoMain, 1–3 = ecoSub. [0, 1, 2, 3] (optional)
channel3: 3 # Meter channel (phase 3), Only required for three-phase measurement. Selects the meter channel to which the CT for phase 3 is connected. [1, 2, 3, 4, 5, 6, 7, 8, 9, 10] (optional)
invert3: false # Invert direction (phase 3), Enable if the power for phase 3 is measured with the opposite sign. (optional)
meters:
- name: my_aux
type: template
template: enecess-ecomain
usage: aux
# Modbus TCP
modbus: tcpip
id: 255
host: # Hostname
port: 502 # Port
phasecount: 1 # Number of phases, For single-phase metering, configure phase 1 only. For three-phase metering, also configure phases 2 and 3. [1, 3]
device1: 0 # Device (phase 1), Selects the device to which the CT for phase 1 is connected. 0 = ecoMain, 1–3 = ecoSub. [0, 1, 2, 3]
channel1: 1 # Meter channel (phase 1), Selects the meter channel to which the CT for phase 1 is connected. [1, 2, 3, 4, 5, 6, 7, 8, 9, 10]
invert1: false # Invert direction (phase 1), Enable if the power for phase 1 is measured with the opposite sign. (optional)
device2: 0 # Device (phase 2), Only required for three-phase measurement. Selects the device to which the CT for phase 2 is connected. 0 = ecoMain, 1–3 = ecoSub. [0, 1, 2, 3] (optional)
channel2: 2 # Meter channel (phase 2), Only required for three-phase measurement. Selects the meter channel to which the CT for phase 2 is connected. [1, 2, 3, 4, 5, 6, 7, 8, 9, 10] (optional)
invert2: false # Invert direction (phase 2), Enable if the power for phase 2 is measured with the opposite sign. (optional)
device3: 0 # Device (phase 3), Only required for three-phase measurement. Selects the device to which the CT for phase 3 is connected. 0 = ecoMain, 1–3 = ecoSub. [0, 1, 2, 3] (optional)
channel3: 3 # Meter channel (phase 3), Only required for three-phase measurement. Selects the meter channel to which the CT for phase 3 is connected. [1, 2, 3, 4, 5, 6, 7, 8, 9, 10] (optional)
invert3: false # Invert direction (phase 3), Enable if the power for phase 3 is measured with the opposite sign. (optional)