Aller au contenu
recharge intelligente

SMA EV Charger (SEMP)

Cette page affiche la version nightly. Passez à la version stable.

Configure the SEMP base URL (http://<charger-host>/SEMP) and the device ID of the charger. IMPORTANT: The charger must NOT be registered directly as a consumer in the Sunny Home Manager / Sunny Portal at the same time!

Setup on the "SMA EV Charger":

  1. Set the rotary switch on the wallbox to PV/Eco charging.
  2. Deactivate the wallbox in the Sunny Portal (it can be added back via evcc later).
  3. Set "Operation with grid connection point meter" to "Yes" and set up a meter (SMA Sunny Home Manager 2 or Energy Meter) under "Configuration -> Parameters -> Meter configuration". This is required for the SEMP interface to be enabled.
  4. Set "Charging release via app" to "No".
  5. Set "Disconnect after full charge" to "No".
  6. Restart the device and wait for it to come back online.
  7. Add the charger in evcc and check/save the configuration (a vehicle may need to be connected for the SEMP interface to report the correct status).

Fonctionnalités prises en charge

  • Régulation en mA: Régulation plus fine du courant de charge (mA au lieu de A) pour mieux exploiter le surplus solaire.
  • 1P/3P: Commutation automatique des phases. Utile pour la charge sur surplus solaire.
  • Compteur intégré: Prise en charge d’un compteur intégré.
  • Modulable: La puissance consommée peut être réduite (p. ex. § 14a EnWG). Voir Limite externe.

Paramètres

NomDescriptionValeurNiveau
uriSEMP base URL

HTTP(S) address

Exemple: http://192.168.178.100/SEMP
facultatif
Exemple de configuration pour evcc.yaml

Si vous ne souhaitez pas passer par l’interface, vous pouvez utiliser ce bloc YAML à la place.

chargers:
- name: my_charger
type: template
template: semp-sma
uri: http://192.168.178.100/SEMP # SEMP base URL, HTTP(S) address