SENEC .Home
Battery control only includes grid charging, not the discharge lock. The SENEC.Home P4 is not supported.
Fonctionnalités prises en charge
- Pilotage de la batterie: Pilotage externe de la charge et de la décharge de la batterie domestique par evcc.
Domaines d’utilisation
- Compteur avant réseau
- Production solaire
- Batterie
Paramètres
| Nom | Description | Valeur | Niveau |
|---|---|---|---|
host | IP address or hostname | facultatif | |
schema | Schema | facultatif | |
capacity [kWh] | Battery capacity | facultatif | |
minsoc [%] | Minimum charge Lower limit as configured on the battery system. Used by optimizer. | facultatif | |
maxsoc [%] | Maximum charge Upper limit as configured on the battery system. Used by optimizer and, on some devices, for grid charging. | facultatif | |
maxchargepower [W] | Maximum charge power Highest power the battery system can charge with. The optimizer plans with charging up to this power. Some devices also use it as grid charging power. | avancé | |
maxdischargepower [W] | Maximum discharge power Highest power the battery system can discharge with. The optimizer plans with discharging up to this power. Smart mode assumes the battery supplies at most this power to vehicle charging. | avancé |
Exemple de configuration pour evcc.yaml
Si vous ne souhaitez pas passer par l’interface, vous pouvez utiliser ce bloc YAML à la place.
meters: - name: my_grid type: template template: senec-home usage: grid host: 192.0.2.2 # IP address or hostname schema: https # Schema, [https, http] (optional)meters: - name: my_pv type: template template: senec-home usage: pv host: 192.0.2.2 # IP address or hostname schema: https # Schema, [https, http] (optional)meters: - name: my_battery type: template template: senec-home usage: battery host: 192.0.2.2 # IP address or hostname schema: https # Schema, [https, http] (optional) capacity: 50 # Battery capacity (kWh), optional minsoc: 0 # Minimum charge (%), Lower limit as configured on the battery system. Used by optimizer. (optional) maxsoc: 100 # Maximum charge (%), Upper limit as configured on the battery system. Used by optimizer and, on some devices, for grid charging. (optional) maxchargepower: # Maximum charge power (W), Highest power the battery system can charge with. The optimizer plans with charging up to this power. Some devices also use it as grid charging power. (optional) maxdischargepower: # Maximum discharge power (W), Highest power the battery system can discharge with. The optimizer plans with discharging up to this power. Smart mode assumes the battery supplies at most this power to vehicle charging. (optional)